Warm or cold we will be there. We build pools throughout

 
  the year. Below is a list of the major building steps for a vinyl
  pool (our most popular type). The process usually takes
  about 21 days but can vary depending on the pool.

 

 

   
  1. Survey the land 8. Set the pump, filter, and heaters
  2. Dig the pool 9. Install coping around the pool
  3. Set the walls 10. Pour the concrete decking.
  4. Level the walls 11. Finalize plumbing and electrical
  5. Smooth and prep floor for liner installation 12. Startup pool
  6. Start the plumbing and electrical 13. Install covers**
  7. Install the liner and fill the pool with water. 14. Finalize pool surroundings
   
  ** Safety covers and automatic covers available.