The Process

 Step 1 - Survey the area and dig the hole

The yard is surveyed and marked, then the hole is dug out and shaped.  A gravel floor is put in and smoothed to match up with the bottom of the fiberglass pool shell. 

Step 2 - Set the pool

The pool is carried in and carefully set into place and leveled.  When there is no room to move the fiberglass shell between the houses you some times have to go over the home.  Here is a video of us doing this. 

 

Step 3 - Plumbing and Backfill

At this point the plumbing is connected to the pool system and the pool is back filled.  After the backfill is complete a concrete collar is poured around the top.

Step 4 - Decking and Finalization

At this point the pool is filled and the coping / decking can be set around the pool.  The final connections are made and the pool can be started.  Landscaping and fencing can also be installed at this time.